Invitation of public comments for access permission to Fuel Stations, Retails Outlets, etc.
S. No. State Subject Issue Date
191 Chhattisgarh Permission for laying underground Optical Fiber Cable from Km.60.778 to Km.97.600 (From Village Kenda to Ratanpur at Mahamaya Mandir Turning) section of NH-45 Ext., in Block- Kota, District-Bilaspur, State- Chhattisgarh (4.85 Mb application-pdf) 19-01-2021
192 Haryana Rehabilitation and up-gradation of existing 2 lane with paved shoulder of Jhajjar-Loharu Section from Km 130.770 to Km 228.630 of NH-334B in the State of Haryana on EPC basis under NH(O)-Part-I as 2-lane with paved shoulder-NOC for laying of HDPE Rising main from 5 MLD STP Charkhi Dadri to Drain No. 8 of diameter 500 mm o along New Nh-334 B from Km 3.300 to Km 9.300 (RHS) in District Charkhi Dadri in the State of Haryana by open cut method (1.00 Mb application-pdf) 19-01-2021
193 Tamil Nadu PIU–Coimbatore – Implementation of ‘Bharatmala Pariyojana’ Phase – I – Assigning 3 Project Stretches / NHs to Tamil Nadu State NH- wing – “Mettur – Bhawani – Erode – NH-544 – Updation of Detailed Project Report (DPR) prepared by Tamil Nadu Road Sector Project (TNRSP) for NHAI – Salem (NH) Circle – Gobichettipalayam (NH) Division – Proposal seeking permission for laying of underground agricultural 400mm dia pipeline from Km 61/640 to Km 63/080 (RHS) and across the road at Km 63/080 at NH544H of Thoppur – Mettur Dam – Bhavani – Erode Road at S.F.No.: 67/2D at Padavalkalvai Village, Bhavani Taluk, Erode District from this site to S.F.No.: 236/2B at Mathur Village, Anthiyur Taluk, Erode District, Tamil Nadu (1.02 Mb application-pdf) 19-01-2021
194 Haryana Request for granting the permission to lay 900 mm diameter casing water pipeline (MS pipe) for the project of Delhi Jal Board, Govt. of NCT of Delhi for crossing at Km. 22.175 on NH08 (new NH-48) in village Rajokri, Tehsil – Vasant Vihar & district New Delhi (1.06 Mb application-pdf) 18-01-2021
195 Odisha Execution of 3 No's of Individual Rural Piped Water Supply Project in Hemgiri, Kutra & Rajgangpur Block of Sundargarh Dist. Including Five Years Operation & Maintenance" on EPC basis - Permission to lay pipe line Across NH-49 at the Chainage Km.208.355 (5.40 Mb application-pdf) 18-01-2021
196 Kerala NHAI-RO Kerala-Six laning of Start of Kollam bypass to Kadambattukonam Section of NH-47 (New NH-66) (from Design Ch.486+000 to Design Ch. 517+250) (Total length 31.25 km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna-Request for laying of OFC cable from Km 494+320 to Km 494+920 and from Km 496+300 to Km 499+500 by Reliance Jio Infocom Ltd (301.07 Kb application-pdf) 17-01-2021
197 Kerala NHAI-RO Kerala-Four Laning of Walayar-Vadakkenchery (Km 182.250 to Km 240.000) of NH-544 on BOT(Toll) basis- Operation & Maintenance stage - Laying/crossing of underground Natural Gas pipeline in between Km.188.050 and 191.900 and of NH-544 for a length of 3.895Km by M/s IOAGPL (280.31 Kb application-pdf) 17-01-2021
198 Maharashtra NHAI-PIU-NSK - Four laning of Sinnar to Shirdi Section of NH 160 from Design Km. 0/000 to Km. 50/943 including Sinnar Bypass of 3.375 km in the State of Maharashtra on Hybrid Annuity Mode – GAIL (India) Ltd.’s proposal for crossing Gas Pipeline & OFC across project stretch at Km. 44.000 on Sinnar-Shirdi Stretch (1.05 Mb application-pdf) 15-01-2021
199 Odisha Permission for laying Natural Gas Pipeline 12” OD x 0.281" WT MS pipeline along with 40 mm OFC duct along NH-55 from Simlipara Chack (Near Raaz Hotel) Angul to Gobindpur, Dhenkanal from km.103.294 to km.93.294 and from Mandabereni, Angul to Gobindpur, Dhenkanal from km.93.294 to km.34.000 (6.78 Mb application-pdf) 15-01-2021
200 Odisha Permission for laying Natural Gas Pipeline 8” OD x 0.281" WT MS pipeline along with NH-53 from Kamakhyanagar (Near Kwality Lodge 7 Hotel} to Bhuban (Near Bhuban Bus stand) from chainage 332,837 to Km.367,332 (5.95 Mb application-pdf) 15-01-2021

Pages